City
of Council, ID, On-Site Liquid Sodium Hypochlorite Generation
System
This
project was funded utilizing City funds. The project included
design and installation of an on-site liquid sodium hypochlorite
generation system. The system was installed at the City's WWTF.
The system replaced the City's existing gas chlorination system.
It allows the City to safely and effectively meet discharge permit
disinfection requirements at the treatment facility.
|
|
|
|
2002 Water System Improvements Project, Burns, Oregon
This
project was funded with EDA and City funds. The project included
the design of a 2 million gallon glass-lined bolted storage reservoir,
including a geotechnical investigation, six pressure reduction
stations, and approximately 5,800 feet of water line. Project
Completion Date: 2003.
|
|
|
|
Well
#6 Arsenic Removal Pilot Study, Fruitland, Idaho
This
project was one of several EPA Arsenic demonstration projects
funded across the United States to demonstrate treatment technology
to comply with 2006 Arsenic Drinking Water Standards. Holladay
Engineering has acted as liaison between the City and the EPA-consultants
installing the treatment equipment. The project has also involved
construction of a water source and building. Projected Project
Completion Date: 2005.
|
|
|
|
Gem
County - Shadow Butte Industrial Park
The
Shadow Butte Industrial Park project is an industrial/commercial
subdivision being constructed in Gem County. This project consists
of over 2000 lineal feet of water line, 2000+ lineal feet of gravity
sewer line, a regional sewer lift station, 11690 lineal feet of
pressure sewer line, two municipal water wells, a steel bolted
water reservoir, a booster station, accessory structures, and
highway widening. This project is being funded by multiple sources
including EDA and the State of Idaho. The water system will be
a stand alone municipal system with capacity to accommodate fire
flows. The sewer system was designed to accommodate expansion
in this area. Coordination between the County and the City of
Emmett has been instrumental to the success of this project. The
pressure sewer will be connected to the head works of the existing
City of Emmett wastewater treatment plant and will be contained
within ITD right-of-way, Gem County right-of-way, and City of
Emmett right-of-way. Coordination between Idaho Transportation
Department and the Army Corps of Engineers has been vital due
to the project's impact to the adjacent Highway 52 and the existing
wetlands.
|
|
|
|
City
of Vale, OR - Arsenic Removal Pilot Study
This
project was an EPA Arsenic demonstration project that was funded
to demonstrate treatment technology to comply with 2006 Arsenic
Drinking Water Standards. Holladay Engineering has acted as liaison
between the City and the EPA-consultants installing the treatment
equipment. The project is currently underway and involves construction
of an evaporative basin for the system's brine waste treatment.
A treatment building was also added on to the existing well house
to house the ion exchange equipment. The arsenic removal project
involves the entire water system for the City of Vale.
|
|
|