| |
|
City
of Council, ID - US 95 Council Alternate Route,
Idaho Transportation Department 3
This
is an ongoing project. Survey work includes obtaining access for
right of entry to affected landowners' property, establish project
control, perform topographic land surveying, and developing new
right of way alignment and basemaps.
|
|
|
|
City of Ontario, OR - Local Improvement District #45
This
project included the completion of the Director's Report with
alternate alignments for two street sections, meetings with property
owners, design, and construction management of two street sections
(SW 4th Street and Sunset Drive). The project totaled approximately
3,365 lineal feet street improvements including water, sanitary
sewer, and storm sewer improvements.
|
|
|
|
City
of Middleton - Arbor Drive/1st Avenue West, Hawthorne Drive, Concord
Street, Main Street
These
projects consisted of a combined total of approximately 5,000
lineal feet of street improvements. The projects included the
design of curb and gutter, storm drainage, and construction management.
These projects required coordination with City staff during construction
to minimize costs incurred by the City and to utilize their knowledge
and experience of construction practices.
|
|
|
|
Oasis
Road Realignment, Payette County
Design
services included design of roadway realignment (horizontal and
vertical), replacement of two bridges, pavement and base design,
right-of-way acquisition, preparation of plans and specifications.
Design was in accordance with County and AASHTO standards. Project
Completion Date: 2002.
|
|
|
|
|